Montgomery County RainScapes: what the rebate pays, and what your plan has to show
Sources (3)
Sources (3)
Free ZIP check Get My Yard Plan ($11.99) A My Yard Plan for your ZIP: plants picked for your area, each with cited legal status, plus layout steps and a shopping list, delivered within 24 hours. Now in 50 states.
My Yard Plan: $11.99
Hand-picked plants that grow together, sized for your space. Digital download — nothing is shipped.
Free: check a plant for your ZIP. $11.99 plan: exactly what to plant, where, and how to build it, with a shopping list, in 24 hours.
Now in 50 states, including VA, NC, GA, OH, PA, NY, NJ, IL and MI
Get a plan for my backyardNot affiliated. PlantLegit is not Montgomery County, the Department of Environmental Protection, or the RainScapes program, and this page is not an official application, approval, or legal advice. Rebate amounts, caps, eligibility, and paperwork change. Pre-approval is often required. Confirm every number and rule on the official pages linked above before you apply or start work. A PlantLegit plan does not guarantee a rebate.
Checked November 10, 2026 (America/New_York) from the official pages in Sources. Where a figure was not on those pages, this page says “not listed.”
What the program pays
| Rain garden | Conservation landscape | |
|---|---|---|
| Rate | $10 / sq ft of total garden area | $5 / sq ft with no temporary ponding; $6 / sq ft with 3 inches of temporary ponding |
| Residential minimum | 75 sq ft of total garden area | 250 sq ft total (can be more than one garden; no garden smaller than 75 sq ft). A 3-inch ponding project must be at least 250 sq ft. |
| Residential cap | $7,500 maximum rebate per parcel (shared with other RainScapes project types on the overview page) | |
| Commercial / HOA / multifamily / institutional cap | $20,000 per parcel | |
| Commercial minimum | 100 sq ft | 350 sq ft total, same 75 sq ft floor per garden |
Remaining program budget was not listed on the pages opened today. The overview says applications are currently accepted first come, first served, and the wait to hear from an assigned RainScapes planner is about 6–8 weeks from submission.
Who qualifies
- Properties in Montgomery County, Maryland, outside Rockville, Gaithersburg, and Takoma Park. Those three municipalities collect the Water Quality Protection Charge separately.
- A ZIP list was not listed. Eligibility is by jurisdiction, not a published ZIP table.
- On private property only. Not in the county right-of-way or an easement.
- Only new, voluntary projects. RainScapes rebates cannot be used to fulfill a county-required stormwater permit.
- The project must intercept runoff from an impervious surface. A rain garden is “not suited for multiple sources of runoff.” A conservation landscape may intercept runoff from one or more impervious surfaces.
- Must not pond (or, for a conservation landscape, temporarily pond) within 10 feet of a house foundation. A rain garden must also be downhill from buildings, on a slope of no more than 12%, and at least 10 feet from foundations.
- A conservation landscape replaces existing turf, invasive plants, or eroded soils.
Steps, from the official pages
- Review the official requirements for the project type and the county's application process (linked from the overview).
- Apply. Include a planting plan and a populated plant list, plus an HOA approval letter if it applies. After you submit, the site has to pass a preliminary inspection for suitability.
- Wait for a RainScapes planner. The overview gives a wait of about 6–8 weeks.
- Do not install until the planner approves the plan and plant list.
- Install to the approved plan. A rain garden also has to pass a percolation test first (0–36 hours: amend soil with compost 12 inches below the 6-inch ponding depth; over 36 hours is not a suitable rain-garden site — the county points you to a conservation landscape with 3 inches of temporary ponding instead).
- Submit itemized receipts or a paid-in-full invoice (tax is subtracted), electronically sign the Property Owner Agreement, and pass a final inspection.
A photo requirement at application or at final inspection was not listed on the two requirements pages opened today.
What the program wants from your planting plan (7)
- A planting plan with a graphic scale and a north arrow, showing plant locations and quantities. For a rain garden, also show the inlet, overflow, and berm.
- A plant-list spreadsheet with variety, quantity, and size (the county provides a blank spreadsheet).
- At least 75% native plants (cultivars accepted). Mid-Atlantic natives are preferred; East Coast natives are acceptable. Up to 25% may be non-native if they are not invasive. Include groundcovers.
- Spacing that will give full ground coverage in 1–2 years. Rain-garden spacing named on the requirements page: 12–18 inches for perennials, 36–48 inches for shrubs. Side slopes, basin, and berm must all be planted.
- Container size a quart or larger for non-groundcover plants. Seeding is not permitted. Landscape plugs may be approved case by case, typically for groundcovers.
- Rain garden: size the garden to treat at least 1.2 inches of rain in 24 hours (2.7 inches is encouraged) using the county estimator or sizing table; final size including the berm is the ponding footprint × 1.25, and must be at least 75 sq ft. Ponding depth 6–9 inches above the mulch. Overflow onto a pervious surface for at least 10 feet, not into the right-of-way or a neighbor.
- Conservation landscape with 3 inches of temporary ponding: berm with an overflow notch, and a sizing calculation (impervious area × 20% = required garden size).
A $11.99 My Yard Plan is a ZIP-specific planting plan with cited legal status. It is not a RainScapes application packet, and it does not replace the county spreadsheet, perc test, or planner approval.